The work of the concrete plant "Compact-90" takes place automatically according to the principle of "one button". The operator needs to select the brand of concrete (M50 ... M500) and its quantity for loading into the concrete mixer, press the start cycle button. The PA2.0 control panel is located in the operator's cabin, which can be installed when working in two positions: transport (built into the frame) or a convenient place for work near the concrete plant. The entire installation is mounted on a frame that is installed on a flat platform, without using a foundation. The BP-2G-2250s twin-shaft concrete mixer is installed on a flyover with a discharge height of 4 meters. The concrete mixer is equipped with a skip with a bottom shutter for lifting and loading the mixture. For storage and inert dosing: DKM-54 dosing complex. Inert are stored in bins, the number of bins 3 to 18 cubic meters. meters, the total volume of bunkers 54 cubic meters. meters. A belt conveyor-dispenser is installed under the hoppers, on which the components are dispensed, the components are fed from the hoppers by opening the Camozzi air locks (Italy). When you set the necessary dose of inert, the conveyor is turned on and inert are fed into the skip, which lifts the components into the concrete mixer. Cement is stored in a special warehouse - cement silo (not included in the basic package). The silo for cement must be selected based on the two daily supply capacity. To supply cement from a silo to a cement dispenser, it is necessary to purchase a screw of the required length.